Weltec's
engineers designed and installed more than 30,000
Category 6 outlets at HSBC Centre to support the
use of data, voice and multimedia applications at
bandwidths of up to 250MHz. The Engineers also designed
and built more than 10,000 metres of pre-wired 40A
Standard and Clean Earth Underfloor Power Track,
which distributes domestic power, supply throughout
the floor space. A total of 9,000 flush floor outlet
boxes were installed under the raised floor to provide
electrical power, data and telephone services.
|
|
 |
|
 |
|
|
|
Weltec's
engineers designed and installed more than 13,500
Category 5e outlets at BOC Centre to support the
use of data, voice and multimedia applications at
bandwidths of up to 100MHz.
|
|
 |
|
.gif) |
|
|
|
The
TKO project is a unique opportunity for introducing
new technologies and system, for improving operation
and reliability. With the change to digital application
.TVB needs proven quality and reliable cables to
ensure high performance and absolute signal integrity
during transmission. With technology ever evolving
and a huge range of option for the new site. Equipment
selection has been comprehensive and time-consuming,
involving product demonstration to a specialist committee
plus intensive evaluation of the product on performance
and their relevance to TVB's operational needs. A
total of 3,232,000 ft of Belden cables was selected
for use in Postproduction, Production, Master Control
and News areas on the basic of performance, quality
and competitive pricing.
|
|
| |
|
|
|
|
|